Dean Hotel Refurbishment

Client
Press-Up Limited
Duration
September 2013 - March 2014

H&J Marin Construction carried out refurbishment works at the existing bank building in the heart of Dublin.

The building was taken back to the shell and transformed into a Boutique Hotel consisting of:

  • 48 bedrooms
  • Reception
  • 2 bars
  • Restaurant
  • Kitchen
  • Lounge Areas
  • New Mechanical and Electrical Installations
  • New lift installations